Instructions for installing horizontal sandwich panel strips

2022/04/08 17:22

1. Unloading massive-sized sandwich panels and container profile sheets calls for the usage of fork carry vans with a massive guide vicinity and a massive fork span.


2.Begin with the aid of using putting in the sandwich panels with the starter flashing crafted from the thicker sheet steel. Verify the best positioning of every element with a spirit level. This will resource the correct positioning of the primary sandwich panel.


three. Seal all joints among the sandwich panel and the framework with a waterproofed self-adhesive gasket. Apply the waterproofed self-adhesive gaskets to the starter flashing, strip footing, framework columns, constructing frames, beams and purlins.


4. Before putting in the primary row of sandwich panels, a drip cap have to be mounted with a drip aspect lengthy sufficient to empty away all rain water glide from the wall the front and the strip footing. It can be not possible to put in the precise drip cap with the sandwich panels already attached.


5. Due to their tremendous weight, the sandwich panels have to be moved with the aid of using multiple person. Remove the protecting movie from the indoor aspect of the every sandwich panel earlier than fastening. Remove the outdoor-aspect shielding movie from the sandwich panels on the very last degree of production to make sure most safety towards dirt. However, the protecting movie have to be eliminated inside three weeks of the manufacturing date of the sandwich panel.