Installation steps of metal carving board
Metal carving board is a kind of wall building material with many functions, which is widely used in many places. The plate is installed It's very convenient to get up. Let's introduce its installation steps in detail!
1. Base wall: the layered structure of metal carved board ensures the firmness and smoothness of the thermal insulation decorative board. So the grassroots should
Achieve the standard plastering, no cracking, no powder dropping, no sanding, no hollowing, no peeling, smooth surface, vertical facade, yin and Yang The angle is vertical, and the concave convex and rough of the base wall can be adjusted by special mortar.
2. Paste: to meet the specified bond strength requirements, just like the special mortar for light board, paste it directly to the wall.
3. Anchoring: use anchors, fasten the facing layer, and connect the plate with the wall firmly again, especially the high wall It is more secure to use this kind of duplex fixed mode in a two storey building.
4. Joint treatment: a 5mm-10mm wide joint shall be reserved between the two boards. When the mortar at the bottom of the finished board is dry, the joint shall be sealed, Foam material is embedded in the joint, then fill the whole seams with weatherproof silicone. Generally speaking, the installation of metal engraving board
It is divided into four stages: base wall, pasting, anchoring and joint treatment. We should install the board strictly according to the above steps Installation, installation process to do a good job in details, to avoid other failures.